How to Calculate a Screw Pile Foundation



The foundation is the foundation of any structure, especially houses, barns, or utility buildings. Properly calculating a screw pile foundation is key, affecting the durability and stability of the entire structure. In this article, we'll cover the basic steps to help you correctly calculate a screw pile foundation.

Why Choose Screw Piles?

Screw piles are becoming increasingly popular due to their unique properties:

• Ease of installation.

• High load-bearing capacity.

• Works in difficult soil conditions.

• No concrete work required.

• Environmentally friendly process.

All these factors make screw piles an ideal choice for fast and reliable construction.

Steps for Calculating a Screw Pile Foundation

Calculating a screw pile foundation involves several stages:

• Assessing soil characteristics.

• Determining the foundation load.

• Selecting the number and depth of piles.

• Design development.

Let's take a closer look at each of these steps.

Assessing Soil Characteristics

First, you need to conduct a geological survey. This will help you determine:

• Soil type (sand, clay, loam, etc.).

• Groundwater level.

• Soil load-bearing characteristics.

This data will help you estimate the load the piles can support and the depth to which they should be driven.

Determining the Foundation Load

The next step is calculating the load the foundation will support. This includes:

• The weight of the structure itself.

• The weight of furniture and equipment.

• Additional loads (snow, wind, etc.).

Add up all the loads to get a complete estimate of how much weight the structure must support.

Selecting the Number and Depth of Piles

Once you know the loads and soil characteristics, you can proceed to selecting the number and depth of piles:

• For lightweight structures (utility buildings, small sheds), 4-6 piles are typically used. • For heavier structures (dachas, houses), the number of piles can increase to 8-12.

• The depth depends on the soil type and can vary from 1.5 to 3 meters.

It is also recommended to consider the distance between piles, which is typically 2-3 meters.

Working with the project

Once all the characteristics and parameters have been determined, you can begin developing the foundation design. It is important to consider all the details to avoid installation errors:

• Pile placement diagram.

• Installation requirements.

• Calculation of required materials.

If necessary, engage professionals to adjust the plan.


Comments

Popular posts from this blog

Portable helical pile driver: an overview of its advantages

Thanks to its compact size and self-propelled mobility, a portable helical pile driver saves time and eliminates the need for additional equipment to move between pile driving sites. It can independently hook piles and handle pile driving perfectly, even in the most confined spaces. Furthermore, mini pile drivers are highly productive and reliable. Modern models are equipped with automatic systems that simplify the pile driving process and ensure precision. This guarantees high-quality work and project deadlines. Furthermore, a mini pile driver requires less fuel and requires less maintenance than standard pile drivers. This reduces the overall cost of construction, making a compact pile driver—purchasing or renting one, depending on your budget and company objectives—the optimal option for most companies working in industrial and private construction. Compact and mobile pile drivers are easy to transport to the job site, reducing logistics costs and downtime. The machine can mo...